UC:IL:UseCases: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
(Distinguished use case "simulation" (pri 4) from the other use cases that also could be used for other type of simulations (for instance a signal technical test simulation)) |
|||
Line 12: | Line 12: | ||
| 1 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] || || EULYNX || ongoing | | 1 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] || || EULYNX || ongoing | ||
|- | |- | ||
| 2 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Exemple}}]] || || Jernbaneverket || | | 2 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Exemple}}]] || || Jernbaneverket Signalling Dpt || | ||
|- | |- | ||
| 3 || [[IL:UC:InterlockingEngineering|Interlocking engineering]] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || || || | | 3 || [[IL:UC:InterlockingEngineering|Interlocking engineering]] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || || || | ||
|- | |- | ||
| 4 || [[IL:UC:Simulation| | | 4 || [[IL:UC:Simulation|Capacity Operational Simulation]] || {{Deu|Leistungsfähigkeit Simulation}} || || || Jernbaneverket Capacity Dpt || | ||
|- | |- | ||
| 5 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|| || || || | | 5 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|| || || || |
Revision as of 09:25, 15 September 2016
| ||||||||
|
This page provides use cases specific to the IL-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.
|
List of Use Cases for Interlocking
The following list provides links to the use cases related with interlocking:
Priority | Description (EN) | Description (DE) | Description (FR) | Abbreviation | Reported by | Status |
---|---|---|---|---|---|---|
1 | Data prepration for interlocking | Datenbereitstellung für Stellwerkssysteme | [[IL:UC:EulynxDataPreparationInterlocking|]] | EULYNX | ongoing | |
2 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] | Jernbaneverket Signalling Dpt | ||
3 | Interlocking engineering | Stellwerksprojektierung | [[IL:UC:InterlockingEngineering|]] | |||
4 | Capacity Operational Simulation | Leistungsfähigkeit Simulation | Jernbaneverket Capacity Dpt | |||
5 | Operation and Control | Betriebsführung | ||||
6 | Hardware and cable plan | Aussenanlage und Kabelplan | ||||
7 | Site preparation data for Signal Controlled Warning Systems | Daten zur Standortvorbereitung für Rottenwarnsysteme | SCWS |