UC:IS:UseCases: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
m (correcting spelling: Trac --> Track)
m (renaiming use case development status information)
Line 13: Line 13:
|RINR
|RINR
|
|
|Veraltet
|ongoing
|-
|-
|1
|1
Line 21: Line 21:
|NEST
|NEST
|
|
|Veraltet
|ongoing
|-
|-
|1
|1
Line 29: Line 29:
|SCTP
|SCTP
|
|
|
|ongoing
|-
|-
|2
|2
Line 37: Line 37:
|POSI
|POSI
|
|
|Aktuell
|draft
|-
|-
|2
|2
Line 45: Line 45:
|ASSR
|ASSR
|DLR for IN2Rail project
|DLR for IN2Rail project
|
|draft
|-
|-
|3
|3
Line 53: Line 53:
|ISRC
|ISRC
|Bahnkonzept
|Bahnkonzept
|
|draft
|-
|-
|3
|3
Line 61: Line 61:
|ISIL
|ISIL
|
|
|Aktuell
|draft
|-
|-
|3
|3
Line 69: Line 69:
|DASY
|DASY
|
|
|Aktuell
|draft
|-
|-
|3
|3
Line 77: Line 77:
|MAPL
|MAPL
|
|
|Aktuell
|draft
|-
|-
|3
|3
Line 85: Line 85:
|PISY
|PISY
|
|
|Aktuell
|draft
|-
|-
|3
|3
Line 93: Line 93:
|CAPL
|CAPL
|Jernbaneverket
|Jernbaneverket
|
|draft
|-
|-
|3
|3
Line 101: Line 101:
|NRER
|NRER
|ÖBB
|ÖBB
|
|draft
|-
|-
|3
|3
Line 109: Line 109:
|SPED
|SPED
|ÖBB
|ÖBB
|
|draft
|-
|-
|3
|3
Line 117: Line 117:
|ISTT
|ISTT
|ProRail
|ProRail
|
|draft
|-
|-
|3
|3
Line 125: Line 125:
|CASP
|CASP
|RailComplete
|RailComplete
|
|draft
|-
|-
|3
|3
Line 133: Line 133:
|
|
|
|
|
|draft
|-
|-
|3
|3

Revision as of 09:56, 2 November 2016

RailML Trademark RGB V2.png
XML Railway exchange format
https://railML.org
Latest release: 2.5
(September 1st, 2021)
 
Main Menu
 
Subschemas
XML tree
UML diagrams
Use cases
Versions & Changes

This page provides use cases specific to the IS-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.

List of Use Cases

The following list provides links to the use cases for the exchange of data between applications related with railway infrastructure:

Priority Description (EN) Description (DE) Description (FR) Abbreviation Reported by Status
1 RINF Reporting RINF Meldung RINR ongoing
1 Network statement of an infrastructure manager Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers Document de référence du réseau de opérateur réseau ferroviaire NEST ongoing
1 Schematic Track Plan Schematische Gleisplandarstellung SCTP ongoing
2 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft
2 Asset status representation Darstellung des Infrastrukturzustands ASSR DLR for IN2Rail project draft
3 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC Bahnkonzept draft
3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Herstellern ISIL draft
3 Driver Advisory System (DAS) Fahrerassistenzsystem DASY draft
3 Maintenance Planning Wartungsplanung MAPL draft
3 Passenger Information System Fahrgastinformationssystem PISY draft
3 Capacity Planning Kapazitätsplanung CAPL Jernbaneverket draft
3 NRE Reporting NRE Meldung NRER ÖBB draft
3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED ÖBB draft
3 Timetabling Fahrplanerstellung ISTT ProRail draft
3 CAD for railway signaling CAD für Zugsignalisierung CASP RailComplete draft
3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungsinformationen von Schienenanlagen draft
3 Railway Infrastructure Visualisation Visualisierung von Schieneninfrastruktur ISVI Veraltet