UC:TT:UseCases: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[unchecked revision][unchecked revision]
mNo edit summary
Line 11: Line 11:
* [[TT:UC:AdoptVehicleWorkingSchedulingToTimetableChanges |Adopt vehicle working scheduling to timetable changes; {{Deu|Umlauf an Jahresfahrplan anpassen}} (<font color="green">writer: IVU (21.05.15) </font color>; <font color="green">reviewer: HaCon</font color>) ]]
* [[TT:UC:AdoptVehicleWorkingSchedulingToTimetableChanges |Adopt vehicle working scheduling to timetable changes; {{Deu|Umlauf an Jahresfahrplan anpassen}} (<font color="green">writer: IVU (21.05.15) </font color>; <font color="green">reviewer: HaCon</font color>) ]]
* [[TT:UC:ExchangeOfFormationData |Exchange of formation data; {{Deu|Austausch von Wagenreihungen/Behängungsdaten}} (<font color="green">writer: iRFP (21.05.15)</font color>; <font color="red">reviewer: ???</font color>)]]
* [[TT:UC:ExchangeOfFormationData |Exchange of formation data; {{Deu|Austausch von Wagenreihungen/Behängungsdaten}} (<font color="green">writer: iRFP (21.05.15)</font color>; <font color="red">reviewer: ???</font color>)]]
* [[TT:UC:TAF/TAP TSI |TAF/TAP TSI requirements; {{Deu|TAF/TAP TSI Anforderungen}} (<font color="green">writer: ERA</font color>; <font color="red">reviewer: iRFP</font color>) ]]
* Betriebssimulation Fahrplan (<font color="red">writer: OTRT</font color>; <font color="red">reviewer: SMA</font color>)
* Betriebssimulation Fahrplan (<font color="red">writer: OTRT</font color>; <font color="red">reviewer: SMA</font color>)
* Langfristfahrplanerstellung / Infrastruktur (<font color="red">writer: SMA</font color>; <font color="red">reviewer: ???</font color>)
* Langfristfahrplanerstellung / Infrastruktur (<font color="red">writer: SMA</font color>; <font color="red">reviewer: ???</font color>)
Line 17: Line 18:
* Disposition Fahrzeugeinsatz (<font color="red">writer: ???</font color>; <font color="red">reviewer: ???</font color>)
* Disposition Fahrzeugeinsatz (<font color="red">writer: ???</font color>; <font color="red">reviewer: ???</font color>)
* Ergebnis Fahrplansimulation (<font color="red">writer: ???</font color>; <font color="red">reviewer: ???</font color>)
* Ergebnis Fahrplansimulation (<font color="red">writer: ???</font color>; <font color="red">reviewer: ???</font color>)
* [[TT:UC:TAF/TAP TSI |TAF/TAP TSI requirements; {{Deu|TAF/TAP TSI Anforderungen}} (<font color="red">writer: ERA</font color>; <font color="red">reviewer: iRFP</font color>) ]]
* Fahrgastinformation im Zug (<font color="red">writer: PSI</font color>; <font color="red">reviewer: iRFP</font color>)
* Fahrgastinformation im Zug (<font color="red">writer: PSI</font color>; <font color="red">reviewer: iRFP</font color>)
* Betriebsleitsysteme/RBL (<font color="red">writer: INIT or Interautomation</font color>; <font color="red">reviewer: IVU</font color>)
* Betriebsleitsysteme/RBL (<font color="red">writer: INIT or Interautomation</font color>; <font color="red">reviewer: IVU</font color>)

Revision as of 15:01, 29 September 2015

Use Cases for "Timetable and Rostering"

List of Use Cases

The following list provide links to the use cases related with the exchange of timetable data:

Glossary

  • LTP = long term planning: the yearly timetable(s)
  • STP = short term planning: changes to the current production timetable up to the point that changes can be published to downstream systems (passenger information, train control, train operators, etc.)