UC:TT:UseCases: Difference between revisions
Jump to navigation
Jump to search
[unchecked revision] | [checked revision] |
m (iRFP as reviewer of UC TAF/TAP TSI requirements removed (was planned for booking system, but UC content changed)) |
(Translations added) |
||
Line 3: | Line 3: | ||
=== List of Use Cases === | === List of Use Cases === | ||
The following list provide links to the use cases related with the exchange of timetable data: | The following list provide links to the use cases related with the exchange of timetable data (TT schema): | ||
* [[TT:UC:TimetableInformation |Timetable Information; {{Deu|Fahrplanauskunft}}; {{Fra| | * [[TT:UC:TimetableInformation |Timetable Information; {{Deu|Fahrplanauskunft}}; {{Fra|Renseignement sur l'horaire}} (<font color="green">writer: HaCon (13.03.15)</font color>; <font color="green">reviewer: IVU</font color>)]] | ||
* [[TT:UC:PassengerInformationAtStations |Passenger information at stations; {{Deu|Fahrgastinformation am Bahnhof }} (<font color="green">writer: PSI (20.05.15)</font color>; <font color="red">reviewer: iRFP</font color>)]] | * [[TT:UC:PassengerInformationAtStations |Passenger information at stations; {{Deu|Fahrgastinformation am Bahnhof }} (<font color="green">writer: PSI (20.05.15)</font color>; <font color="red">reviewer: iRFP</font color>)]] | ||
* [[TT:UC:ATimetableForACompetition |A timetable for a competition (call for proposals); {{Deu|Ausschreibungsfahrplan}} (<font color="green">writer: iRFP (21.05.15)</font color>; <font color="red">reviewer: ???</font color>)]] | * [[TT:UC:ATimetableForACompetition |A timetable for a competition (call for proposals); {{Deu|Ausschreibungsfahrplan}} (<font color="green">writer: iRFP (21.05.15)</font color>; <font color="red">reviewer: ???</font color>)]] | ||
Line 13: | Line 13: | ||
* [[TT:UC:TAF/TAP TSI |TAF/TAP TSI requirements; {{Deu|TAF/TAP TSI Anforderungen}} (<font color="green">writer: ERA</font color>; <font color="red">reviewer: ???</font color>) ]] | * [[TT:UC:TAF/TAP TSI |TAF/TAP TSI requirements; {{Deu|TAF/TAP TSI Anforderungen}} (<font color="green">writer: ERA</font color>; <font color="red">reviewer: ???</font color>) ]] | ||
* Betriebssimulation Fahrplan (<font color="red">writer: OTRT</font color>; <font color="red">reviewer: SMA</font color>) | * Betriebssimulation Fahrplan (<font color="red">writer: OTRT</font color>; <font color="red">reviewer: SMA</font color>) | ||
* Langfristfahrplanerstellung / Infrastruktur (<font color="red">writer: SMA</font color>; <font color="red">reviewer: ???</font color>) | * Langfristfahrplanerstellung/Infrastruktur (<font color="red">writer: SMA</font color>; <font color="red">reviewer: ???</font color>) | ||
* Trassenbestellung (<font color="red">writer: SMA</font color>; <font color="red">reviewer: iRFP</font color>) | * Slot ordering; {{Deu|Trassenbestellung}} (<font color="red">writer: SMA</font color>; <font color="red">reviewer: iRFP</font color>) | ||
* Zuglenkung (<font color="red">writer: OTRT</font color>; <font color="red">reviewer: PSI</font color>) | * Automatic Route Setting; {{Deu|Zuglenkung}} (<font color="red">writer: OTRT</font color>; <font color="red">reviewer: PSI</font color>) | ||
* Disposition Fahrzeugeinsatz (<font color="red">writer: ???</font color>; <font color="red">reviewer: ???</font color>) | * Disposition Fahrzeugeinsatz (<font color="red">writer: ???</font color>; <font color="red">reviewer: ???</font color>) | ||
* Ergebnis Fahrplansimulation (<font color="red">writer: ???</font color>; <font color="red">reviewer: ???</font color>) | * Ergebnis Fahrplansimulation (<font color="red">writer: ???</font color>; <font color="red">reviewer: ???</font color>) | ||
* [[TT:UC:FGIInTrain|Fahrgastinformation im Zug (<font color="red">writer: PSI</font color>; <font color="red">reviewer: iRFP</font color>)]] | * [[TT:UC:FGIInTrain|Passenger information inside the train; {{Deu|Fahrgastinformation im Zug}} (<font color="red">writer: PSI</font color>; <font color="red">reviewer: iRFP</font color>)]] | ||
* Betriebsleitsysteme/RBL (<font color="red">writer: INIT or Interautomation</font color>; <font color="red">reviewer: IVU</font color>) | * Betriebsleitsysteme/RBL (<font color="red">writer: INIT or Interautomation</font color>; <font color="red">reviewer: IVU</font color>) | ||
* Dienstbildung Personal Jahresfahrplan (<font color="red">writer: INIT</font color>; <font color="red">reviewer: IVU</font color>) | * Dienstbildung Personal Jahresfahrplan (<font color="red">writer: INIT</font color>; <font color="red">reviewer: IVU</font color>) | ||
Line 26: | Line 26: | ||
* LTP = '''l'''ong '''t'''erm '''p'''lanning: the yearly timetable(s) | * LTP = '''l'''ong '''t'''erm '''p'''lanning: the yearly timetable(s) | ||
* STP = '''s'''hort '''t'''erm '''p'''lanning: changes to the current production timetable up to the point that changes can be ''published'' to downstream systems (passenger information, train control, train operators, etc.) | * STP = '''s'''hort '''t'''erm '''p'''lanning: changes to the current production timetable up to the point that changes can be ''published'' to downstream systems (passenger information, train control, train operators, etc.) | ||
<font color="white">Use cases, usecase, usescases</font color> |
Revision as of 17:10, 20 January 2016
Use Cases for "Timetable and Rostering"
List of Use Cases
The following list provide links to the use cases related with the exchange of timetable data (TT schema):
- Timetable Information; Fahrplanauskunft; (writer: HaCon (13.03.15); reviewer: IVU)
- Passenger information at stations; Fahrgastinformation am Bahnhof (writer: PSI (20.05.15); reviewer: iRFP)
- A timetable for a competition (call for proposals); Ausschreibungsfahrplan (writer: iRFP (21.05.15); reviewer: ???)
- Import complete timetable for vehicle working scheduling and vehicle workings; Umlaufbildung Fahrzeuge Jahresfahrplan (writer: IVU (20.05.15); reviewer: iRFP)
- Adopt vehicle working scheduling to timetable changes; Umlauf an Jahresfahrplan anpassen (writer: IVU (21.05.15) ; reviewer: HaCon)
- Exchange of formation data; Austausch von Wagenreihungen/Behängungsdaten (writer: iRFP (21.05.15); reviewer: ???)
- TAF/TAP TSI requirements; TAF/TAP TSI Anforderungen (writer: ERA; reviewer: ???)
- Betriebssimulation Fahrplan (writer: OTRT; reviewer: SMA)
- Langfristfahrplanerstellung/Infrastruktur (writer: SMA; reviewer: ???)
- Slot ordering; Trassenbestellung (writer: SMA; reviewer: iRFP)
- Automatic Route Setting; Zuglenkung (writer: OTRT; reviewer: PSI)
- Disposition Fahrzeugeinsatz (writer: ???; reviewer: ???)
- Ergebnis Fahrplansimulation (writer: ???; reviewer: ???)
- Passenger information inside the train; Fahrgastinformation im Zug (writer: PSI; reviewer: iRFP)
- Betriebsleitsysteme/RBL (writer: INIT or Interautomation; reviewer: IVU)
- Dienstbildung Personal Jahresfahrplan (writer: INIT; reviewer: IVU)
Glossary
- LTP = long term planning: the yearly timetable(s)
- STP = short term planning: changes to the current production timetable up to the point that changes can be published to downstream systems (passenger information, train control, train operators, etc.)
Use cases, usecase, usescases