Template:StartEndCon: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
(Allgemeiner) |
(added link to https://wiki2.railml.org/wiki/Dev:Defining_temporal_availability_of_infrastructure_elements_and_speed_profiles) |
||
(9 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
<includeonly> {{semcon|Any '''starting time stamp''' (as it may result e.g. from a combination of ''startDate'' and ''startTime'') shall be lower or equal any '''ending time stamp''' (e.g. ''endDate'') if both are given. Must not overlap with other validity periods.}}</includeonly><noinclude> | <includeonly>{{semcon|Any '''starting time stamp''' (as it may result e.g. from a combination of ''startDate'' and ''startTime'') shall be lower or equal any '''ending time stamp''' (e.g. ''endDate'') if both are given. Must not overlap with other validity periods. See also https://wiki2.railml.org/wiki/Dev:Defining_temporal_availability_of_infrastructure_elements_and_speed_profiles|status={{{status|approved}}}|proposed={{{proposed|2018-11-12}}}|approved={{{approved|2019-03-21}}}|id=TT:001}}</includeonly><noinclude> | ||
==Usage== | ==Usage== | ||
This template depicts a [[dev:Semantic Constraints|semantic constraint]] refering to [[IS:designator#Examples_concerning_startDate_and_endDate|these consistecy requirements for time spans]]. | This template depicts a [[dev:Semantic Constraints|semantic constraint]] refering to [[IS:designator#Examples_concerning_startDate_and_endDate|these consistecy requirements for time spans]]. |
Revision as of 19:45, 12 April 2024
Usage
This template depicts a semantic constraint refering to these consistecy requirements for time spans.
Arguments
None
Dependencies
Uses template:note
Examples
{{StartEndCon}}
delivers
|