Search results

Jump to navigation Jump to search
  • Modelling Language (UML). Examples are solutions to use cases. CO Use Cases – IL Use Cases – IS Use Cases – RS Use Cases – TT Use Cases View/edit list on the
    10 bytes (287 words) - 16:31, 3 February 2020
  • name>/<version number>. E.g. for element interlocking there exist the pages IL:interlocking/3.1 and IL:interlocking/3.2. Allways use Template:ElementDocu
    10 bytes (1,478 words) - 18:13, 5 March 2021
  • UC:IL:EulynxDataPreparationInterlocking (category Use case (IL))
    information with signalling industry (link to IS:UC:InterlockingEngineering) The planning of the interlocking and signalling systems for individual yards is
    10 bytes (450 words) - 16:12, 3 February 2020
  • UC:IL:InterlockingEngineering (category Use case (IL))
    functional behaviour of an interlocking now reflects the IM’s rulebook for interlocking. Customise, i.e. engineer, the interlocking to match individual stations
    10 bytes (828 words) - 16:12, 3 February 2020
  • Interlock engineering for signalling within JBV; Stellwerkstechnik für die Signalisierung innerhalb von JBV JBV intend to use this RailML interlocking
    10 bytes (558 words) - 16:12, 3 February 2020
  • data preparation of a SCWS are the topology data from the interlocking system. These interlocking data (IxL-data) describe the track-topology track-elements
    10 bytes (571 words) - 16:12, 3 February 2020
  • UC:IL:Simulation (category Use case (IL))
    internal generic interlocking (table) model. Thus this use case does not require a interlocking table. This distinguishes this IL UC from other IL UC. A route
    10 bytes (969 words) - 16:12, 3 February 2020
  • page is mirrored from page UC:IL:HardwareAndCablePlan in The railML® 3 wiki.
    10 bytes (119 words) - 16:12, 3 February 2020
  • UC:IL:OperationAndControl (category Use case (IL))
    the interlockings within the network are of different type and very often from different suppliers. Thus the configuration from these interlockings has
    10 bytes (209 words) - 16:12, 3 February 2020
  • data, handing-over to the supplier (by using a database). interlocking (see also: Interlocking Engineering) This section serves to specify the required
    10 bytes (367 words) - 16:12, 3 February 2020
  • Geometry Energy Safety system / interlocking Topology, Geometry (Location points, node-centre, node-ports), interlocking, 10 – 15 RINF parameter types for
    10 bytes (343 words) - 16:12, 3 February 2020
  • Main interfaces for TMS is CCS (i.e. IL and RBC), timetable planning system and (optionally) fleet management system. IL TT tbd tbd tbd tbd
    10 bytes (179 words) - 16:12, 3 February 2020
  • Schienenanlagen railML data will be used for engineering signalling and interlocking systems. Engineers are used to working with paper plans that schematically
    10 bytes (383 words) - 16:12, 3 February 2020
  • modified data into the infrastructure manager data bases. IL This interference to interlocking relates to the visualization of routes and their attributes
    10 bytes (198 words) - 16:12, 3 February 2020
  • signalling discipline: track import, signalling import. Infrastructure + interlocking export. Generic topology information (e.g. electrification, track classification
    10 bytes (127 words) - 16:12, 3 February 2020
  • Local operation Areas Shunting Areas Interlockings (if available in this project status) Balise groups Routes Interlockings RBCs Track layout description Points
    10 bytes (441 words) - 16:12, 3 February 2020
  • into the simulation system (currently manual) infrastructure timetable interlocking This section serves to specify the required data regarding certain aspects
    10 bytes (146 words) - 16:12, 3 February 2020
  • timetable tool (Treno) and the simulation tool (Opentrack). The rest (mostly interlocking) is added manually from technical drawings. Jernbaneverket is planning
    10 bytes (687 words) - 16:12, 3 February 2020
  • Typically this is low frequency: once per study, several times per year, etc. Interlocking: -- Infrastructure: <operationalPoint> (macroscopic) Rolling stock: <formation>
    10 bytes (523 words) - 16:12, 3 February 2020
  • related with interlocking: Data prepration for interlocking; Datenbereitstellung für Stellwerkssysteme (reported by EULYNX project) Interlocking engineering
    4 KB (332 words) - 14:05, 13 March 2023
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)