TT:specialService operatingPeriodRef: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
(Konsistenz startDate, endDate)
({{StartEndDoc}})
Line 17: Line 17:


* {{Attr|singleDate}}: This is used to include or exclude a single day. {{AddAnn|| }}
* {{Attr|singleDate}}: This is used to include or exclude a single day. {{AddAnn|| }}
 
* {{Attr|startDate}}: This is used to include or exclude a time period. {{AddAnn|| }}{{StartEndDoc}}
* {{Attr|startDate}}: This is used to include or exclude a time period. {{AddAnn|| }}
* {{Attr|endDate}}: This is used to include or exclude a time period. {{AddAnn|| }}{{StartEndDoc}}
 
* {{Attr|startTime}}: This is used for a more detailed description of the time period. {{AddAnn|| }}{{StartEndDoc}}
* {{Attr|endDate}}: This is used to include or exclude a time period. {{AddAnn|| }}
* {{Attr|endTime}}: This is used for a more detailed description of the time period. {{AddAnn|| }}{{StartEndDoc}}
 
* {{Attr|startTime}}: This is used for a more detailed description of the time period. {{AddAnn|| }}
 
* {{Attr|endTime}}: This is used for a more detailed description of the time period. {{AddAnn|| }}
 
{{InheritAnyAttribute
{{InheritAnyAttribute
|comment={{intro|2.3}}
|comment={{intro|2.3}}

Revision as of 12:47, 18 June 2018


specialService
 


Scheme description / Schemenbeschreibung

Position of specialService in the XML-Tree / Position von specialService im XML-Baum

Multiplicity / Anzahl

[1..1]

Semantics / Bedeutung

(deprecated with version 2.2) — use reference to individual operating period instead.
 
The Element <specialService> describes a calendar based modification of the operatingPeriod by including or excluding certain days or periods. The maximal duration of the underlying timetablePeriod and operatingPeriod may not be expanded with a this <specialService>.

Das Element <specialService> beschreibt die auf einen Kalender bezogene Modifizierung einer Verkehrsperiode operatingPeriod um einzelne Zusatz- und/oder Ausfalltage oder auch Zusatz- und/oder Ausfallperioden. Die maximale Dauer der zugrundeliegenden Fahrplanperiode timetablePeriod beziehungsweise der darauf basierenden Verkehrsperiode operatingPeriod darf dabei aber nicht erweitert werden.

Attributes of specialService / Attribute von specialService

  • type: It has to follow the constraints of xs:string. Possible values are:

Missinginformation.png In this article there is information missing with respect to the semantics of the enumeration items. Please help improving the railML® wiki by filling the gaps. Possibly, you will find further details on the discussion pageFerri Leberl (talk) 16:14, 25 April 2018 (CEST)
  • include
  • exclude

Syntactic Constraints / Syntaktische Beschränkungen

  • startDate xs:date, optional; shall be lower or equal endDate if both are used.
  • endDate xs:date, optional; shall be higher or equal startDate if both are used.

Best practice & Examples / Empfohlene Anwendung & Beispiele

<specialService type="include" singleDate="2009-12-24"/>

Notes / Anmerkungen

Not yet described. / Noch nicht beschrieben.

Open issues / Offene Punkte/Pendenzen

Not yet described. / Noch nicht beschrieben.