Template:StartEndDoc: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
<includeonly> '''startDate''' shall be lower or equal '''endDate''' if both are used. Must not overlap with other validity periods.</includeonly><noinclude> | <includeonly> [[#semcon|Semantic constraint: '''startDate''' shall be lower or equal '''endDate''' if both are used. Must not overlap with other validity periods.]]</includeonly><noinclude> | ||
==Usage== | ==Usage== | ||
This template produces a reminder to consider [[IS:designator#Examples_concerning_startDate_and_endDate|these consistecy requirements for time spans]]. | This template produces a reminder to consider [[IS:designator#Examples_concerning_startDate_and_endDate|these consistecy requirements for time spans]]. |
Revision as of 14:34, 12 November 2018
Usage
This template produces a reminder to consider these consistecy requirements for time spans.
Arguments
None
Dependencies
Uses template:note
Examples
{{StartEndDoc}}
delivers
Semantic constraint: startDate shall be lower or equal endDate if both are used. Must not overlap with other validity periods.