UC:IL:UseCases: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
m (→‎List of Use Cases for Interlocking: Use cases grouped and slightly renamed)
m (→‎List of Use Cases for Interlocking: Typo's fixed & Under construction set)
Line 1: Line 1:
{{navi}}
{{navi}}
This page provides use cases specific to the [[interlocking|IL-subschema]]. See [[Dev:Use cases]] to learn what is a use case, how to contribute to writing good {{rml}}-Use Cases and where to find them in this wiki.
This page provides use cases specific to the [[interlocking|IL-subschema]]. See [[Dev:Use cases]] to learn what is a use case, how to contribute to writing good {{rml}}-Use Cases and where to find them in this wiki.
{{Under construction|date=2016-06-30|topic=Merge similar use cases and rename ''IS:UC:...'' to ''IL:UC:...''|user=[[Benutzer:Coordination|Coordination]] ([[Benutzer Diskussion:Coordination|Diskussion]]) 22:15, 30. Jun. 2016 (CEST)}}
== List of Use Cases for Interlocking ==
== List of Use Cases for Interlocking ==


Line 9: Line 11:
* [[IS:UC:InterlockingEngineering |Interlocking engineering; {{Deu|Stellwerksprojektierung}}; {{Fra|Invariants des système d’enclenchement}}]]
* [[IS:UC:InterlockingEngineering |Interlocking engineering; {{Deu|Stellwerksprojektierung}}; {{Fra|Invariants des système d’enclenchement}}]]
* [[IS:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling; {{Deu|Stellwerkstechnik für Signalisierung}}]] ''(reported by Jernbaneverket, Norway)''
* [[IS:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling; {{Deu|Stellwerkstechnik für Signalisierung}}]] ''(reported by Jernbaneverket, Norway)''
* [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking; {{Deu|Datenbereitstellung für Stellwerkssysteme}}]] ''(reported by EULYNX project)''* [[IS:UC:HardwareAndCablePlan |Hardware and cable plan; {{Deu|Aussenanlage und Kabelplan}}]]
* [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking; {{Deu|Datenbereitstellung für Stellwerkssysteme}}]] ''(reported by EULYNX project)''
* [[IS:UC:HardwareAndCablePlan |Hardware and cable plan; {{Deu|Aussenanlage und Kabelplan}}]]
* [[IS:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]]
* [[IS:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]]

Revision as of 22:15, 30 June 2016

RailML Trademark RGB V2.png
XML Railway exchange format
https://railML.org
Latest release: 2.5
(September 1st, 2021)
 
Main Menu
 
Subschemas
XML tree
UML diagrams
Use cases
Versions & Changes

This page provides use cases specific to the IL-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.

UnderConstruction.png This page is under construction since June 30th 2016. Task: Merge similar use cases and rename IS:UC:... to IL:UC:.... Sorry for temporary problems. See the discussion page to find a summary of the tasks and to coordinate the work on this page. Recognize that the content of this page may change quickly. Coordination (Diskussion) 22:15, 30. Jun. 2016 (CEST)

List of Use Cases for Interlocking

The following list provides links to the use cases related with interlocking: