UC:IL:UseCases: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
(Order Rename ''IS:UC:...'' to ''IL:UC:...'' removed)
Line 6: Line 6:


The following list provides links to the use cases related with interlocking:
The following list provides links to the use cases related with interlocking:
 
{| class="wikitable"
* [[IL:UC:OperationAndControl |Operation and Control; {{Deu|Betriebsführung}}]]
|-
* [[IL:UC:Simulation |Simulation; {{Deu|Simulation}}]]
! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status
* [[IL:UC:InterlockingEngineering |Interlocking engineering; {{Deu|Stellwerksprojektierung}}; {{Fra|Invariants des système d’enclenchement}}]]
|-
* [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling; {{Deu|Stellwerkstechnik für Signalisierung}}]] ''(reported by Jernbaneverket, Norway)''
| 1 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] || || EULYNX || ongoing
* [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking; {{Deu|Datenbereitstellung für Stellwerkssysteme}}]] ''(reported by EULYNX project)''
|-
* [[IL:UC:HardwareAndCablePlan |Hardware and cable plan; {{Deu|Aussenanlage und Kabelplan}}]]
| 2 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Exemple}}]] || || Jernbaneverket ||
* [[IL:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]]
|-
| 3 || [[IL:UC:InterlockingEngineering|Interlocking engineering]] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || || ||
|-
| 4 || [[IL:UC:Simulation|Silulation]] || {{Deu|Simulation}} ||  || || ||
|-
| 5 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|| ||  || ||
|-
| 6 || [[IL:UC:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}||  || || ||
|-
| 7 || [[IL:UC:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} ||  || SCWS|| ||
|}

Revision as of 14:42, 12 September 2016

RailML Trademark RGB V2.png
XML Railway exchange format
https://railML.org
Latest release: 2.5
(September 1st, 2021)
 
Main Menu
 
Subschemas
XML tree
UML diagrams
Use cases
Versions & Changes

This page provides use cases specific to the IL-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.

UnderConstruction.png This page is under construction since June 30th 2016. Task: Merge similar use cases. Sorry for temporary problems. See the discussion page to find a summary of the tasks and to coordinate the work on this page. Recognize that the content of this page may change quickly. Coordination (Diskussion) 22:15, 30. Jun. 2016 (CEST)

List of Use Cases for Interlocking

The following list provides links to the use cases related with interlocking:

Priority Description (EN) Description (DE) Description (FR) Abbreviation Reported by Status
1 Data prepration for interlocking Datenbereitstellung für Stellwerkssysteme [[IL:UC:EulynxDataPreparationInterlocking|]] EULYNX ongoing
2 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] Jernbaneverket
3 Interlocking engineering Stellwerksprojektierung [[IL:UC:InterlockingEngineering|]]
4 Silulation Simulation
5 Operation and Control Betriebsführung
6 Hardware and cable plan Aussenanlage und Kabelplan
7 Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS