UC:IL:UseCases: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
(Plan and namings adapted)
Line 9: Line 9:
! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status
! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status
|-
|-
| 1 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] || || EULYNX || ongoing
| 1 || [[IL:UC:Simulation|Capacity Operational Simulation (routes)]] || {{Deu|Leistungsfähigkeit Simulation}} |||{{Fra|Simulation de la capacité}}|| || Jernbaneverket Capacity Dpt || ongoing
|-
|-
| 2 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|traduire}}]] || || Jernbaneverket Signalling Dpt || draft
| 2 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] || || EULYNX || in negotiation
|-
|-
| 3 || [[IL:UC:InterlockingEngineering|Interlocking engineering]] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || || || draft
| 3 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|traduire}}]] || || Jernbaneverket Signalling Dpt || draft
|-
|-
| 4 || [[IL:UC:Simulation|Capacity Operational Simulation]] || {{Deu|Leistungsfähigkeit Simulation}} |||{{Fra|traduire}}|| || Jernbaneverket Capacity Dpt || discussed
| 4 || [[IL:UC:InterlockingEngineering|Interlocking engineering]] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || || || draft
|-
|-
| 5 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|traduire}}||  || || draft
| 5 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|traduire}}||  || || draft
|-
|-
| 6 || [[IL:UC:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|traduire}}|| || || draft
| 6 || [[IL:UC:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|traduire}}|| SCWS||Thales Austria|| draft
|-
|-
| 7 || [[IL:UC:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|traduire}}|| SCWS||Thales Austria|| draft
| 7 || [[IL:UC:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|traduire}}|| || || draft
|}
|}

Revision as of 13:03, 23 February 2017

RailML Trademark RGB V2.png
XML Railway exchange format
https://railML.org
Latest release: 2.5
(September 1st, 2021)
 
Main Menu
 
Subschemas
XML tree
UML diagrams
Use cases
Versions & Changes

This page provides use cases specific to the IL-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.

List of Use Cases for Interlocking

The following list provides links to the use cases related with interlocking:

Priority Description (EN) Description (DE) Description (FR) Abbreviation Reported by Status
1 Capacity Operational Simulation (routes) Leistungsfähigkeit Simulation Jernbaneverket Capacity Dpt ongoing
2 Data prepration for signalling Datenbereitstellung für Stellwerkssysteme [[IL:UC:EulynxDataPreparationInterlocking|]] EULYNX in negotiation
3 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] Jernbaneverket Signalling Dpt draft
4 Interlocking engineering Stellwerksprojektierung [[IL:UC:InterlockingEngineering|]] draft
5 Operation and Control Betriebsführung draft
6 Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS Thales Austria draft
7 Hardware and cable plan Aussenanlage und Kabelplan draft