UC:IL:UseCases: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
(Konsolidierung)
 
(21 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{navi}}
#redirect[[UC:Use cases/table]]
This page provides use cases specific to the [[interlocking|IL-subschema]]. See [[Dev:Use cases]] to learn what is a use case, how to contribute to writing good {{rml}}-Use Cases and where to find them in this wiki.
== List of Use Cases for Interlocking ==
 
The following list provides links to the use cases related with interlocking:
 
* [[IS:UC:HardwareAndCablePlan |Hardware and cable plan; {{Deu|Aussenanlage und Kabelplan}}]]
* [[IS:UC:OperationAndControl |Operation and Control; {{Deu|Betriebsführung}}]]
* [[IS:UC:InterlockingEngineering |Interlocking engineering; {{Deu|Stellwerksprojektierung}}; {{Fra|Invariants des système d’enclenchement}}]]
* [[IS:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]]
* [[IS:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling within Jernbaneverket (Norway); {{Deu|Stellwerkstechnik für Signalisierung innerhalb von Jernbaneverket (Norwegen)}}]]
* [[IS:UC:Simulation |Simulation; {{Deu|Simulation}}]]
* [[IL:UC:EulynxDataPreparationInterlocking|EULYNX Data prepration for interlocking; {{Deu|EULYNX Datenbereitstellung für Stellwerkssysteme}}]]

Latest revision as of 15:59, 10 October 2018

Redirect to: