UC:IS:UseCases: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
m (Redundant cloumns removed)
(→‎List of Use Cases: +ETCS track net)
(7 intermediate revisions by 3 users not shown)
Line 5: Line 5:
The following list provides links to the use cases for the exchange of data between applications related with railway infrastructure:
The following list provides links to the use cases for the exchange of data between applications related with railway infrastructure:
{| class="wikitable sortable"
{| class="wikitable sortable"
! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status
! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status<br><span style="font-size:50%">[[Dev:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span>
|-
|-
|1
|1
Line 12: Line 12:
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}}
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}}
|NEST
|NEST
|
|SŽDC/ProRail/BaneNOR
|ongoing
|consolidated
|-
|-
|1
|1
Line 20: Line 20:
|{{Fra|Plan du tracé schématique}}
|{{Fra|Plan du tracé schématique}}
|SCTP
|SCTP
|JBV/BaneNOR
|JBD/BaneNOR
|ongoing
|consolidated
|-
|-
|1
|1
Line 29: Line 29:
|RINR
|RINR
|SNCF Réseau
|SNCF Réseau
|ongoing
|consolidated
|-
|2
|[[IS:UC:Track Geometry|Track Geometry]]
|{{Deu|Gleisgeometrie}}
|
|TRGE
|ÖBB Infrastruktur
|review
|-
|-
|2
|2
Line 53: Line 61:
|ISRC
|ISRC
|Bahnkonzept
|Bahnkonzept
|draft
|-
|3
|[[IS:UC:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|{{Deu|Fahrerassistenzsystem}}
|{{Fra|Système d'assistance au conducteur (DAS)}}
|DASY
|
|draft
|draft
|-
|-
Line 60: Line 76:
|{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}}
|{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}}
|ISIL
|ISIL
|
|draft
|-
|3
|[[IS:UC:DriverAdvisoryAystem|Driver Advisory System (DAS)]]
|{{Deu|Fahrerassistenzsystem}}
|{{Fra|Système d'assistance au conducteur (DAS)}}
|DASY
|
|
|draft
|draft
Line 136: Line 144:
|-
|-
|3
|3
|[[IS:UC:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|{{Deu|Eisenbahnbetriebslabor}}
|{{Fra|Laboratoire de simulation ferroviaire}}
|RLAB
|ČVUT
|draft
|-
|
|[[IS:UC:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]]
|[[IS:UC:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]]
|{{Deu|Visualisierung von Schieneninfrastruktur}}
|{{Deu|Visualisierung von Schieneninfrastruktur}}
Line 144: Line 160:
|-
|-
|3
|3
|[[IS:UC:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|[[UC:IS:ETCS track net|ETCS track net]]
|{{Deu|Eisenbahnbetriebslabor}}
|
|{{Fra|Laboratoire de simulation ferroviaire}}
|
|RLAB
|
|ČVUT
|Thales
|draft
|draft
|}
|}

Revision as of 16:41, 10 April 2018

RailML Trademark RGB V2.png
XML Railway exchange format
https://railML.org
Latest release: 2.5
(September 1st, 2021)
 
Main Menu
 
Subschemas
XML tree
UML diagrams
Use cases
Versions & Changes

This page provides use cases specific to the IS-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.

List of Use Cases

The following list provides links to the use cases for the exchange of data between applications related with railway infrastructure:

Priority Description (EN) Description (DE) Description (FR) Abbreviation Reported by Status
how to interpret the status
1 Network statement of an infrastructure manager Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers NEST SŽDC/ProRail/BaneNOR consolidated
1 Schematic Track Plan Schematische Gleisplandarstellung SCTP JBD/BaneNOR consolidated
1 RINF Reporting RINF Meldung RINR SNCF Réseau consolidated
2 Track Geometry Gleisgeometrie TRGE ÖBB Infrastruktur review
2 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft
2 Asset status representation Darstellung des Infrastrukturzustands ASSR DLR for IN2Rail project draft
3 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC Bahnkonzept draft
3 Driver Advisory System (DAS) Fahrerassistenzsystem DASY draft
3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Herstellern ISIL draft
3 Maintenance Planning Wartungsplanung MAPL draft
3 Passenger Information System Fahrgastinformationssystem PISY draft
3 Capacity Planning Kapazitätsplanung CAPL JBV/BaneNOR draft
3 NRE Reporting NRE Meldung NRER ÖBB Infrastruktur draft
3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED ÖBB Infrastruktur draft
3 Timetabling Fahrplanerstellung ISTT ProRail draft
3 CAD for railway signaling CAD für Zugsignalisierung CASP RailComplete draft
3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungsinformationen von Schienenanlagen draft
3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB ČVUT draft
Railway Infrastructure Visualisation Visualisierung von Schieneninfrastruktur ISVI outdated
3 ETCS track net Thales draft