UC:Use cases/table: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
(Linkfix)
No edit summary
 
(10 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<noinclude>[[UC:Use cases#List|Return to article]]
{{mirror|UC:Use cases/table}}
</noinclude>
{| class="wikitable sortable"
|-
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span>
|-
| IL
|
|3.1
|
| [[IL:UC:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated
|-
| IL
|
|
| 1 || [[IL:UC:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated
|-
| IL
|
|
| 3 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| draft
|-
| IL
|
|
| 3 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
|-
| IL
|
|
| 4 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
|-
| IL
|
|
| 5 || [[IL:UC:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
|-
| IL
|
|
| 6 || [[IL:UC:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
|-
|{{anchor|NEST}}IS
|
|3.1
|
|[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]]
|{{Deu|Schie&shy;nen&shy;netz&shy;be&shy;nut&shy;zungs&shy;be&shy;din&shy;gun&shy;gen eines Infrastrukturbetreibers}}
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}}
|NEST
|SŽDC/&#8203;ProRail/&#8203;BaneNOR
|consolidated
|-
|IS
|
|3.1
|
|[[IS:UC:Schematic Track Plan|Schematic Track Plan]]
|{{Deu|Schematische Gleisplandarstellung}}
|{{Fra|Plan du tracé schématique}}
|SCTP
|JBD/BaneNOR
|consolidated
|-
|IS
|
|3.1
|
|[[IS:UC:RINFReporting|RINF Reporting]]
|{{Deu|RINF Meldung}}
|{{Fra|Rapports RINF}}
|RINR
|SNCF Réseau
|merged into [[#NEST|NEST]]
|-
|IS
|TT, IL
|
|2
|[[IS:UC:IntegratedTMS|Integrated TMS]]
|{{Deu|Integriertes Verkehrsmanagement}}
|{{Fra|-}}
|ITMS
|Bombardier
|draft
|-
|IS
|
|
|2
|[[IS:UC:Track Geometry|Track Geometry]]
|{{Deu|Gleisgeometrie}}
|
|TRGE
|ÖBB Infrastruktur
|review
|-
|IS
|
|
|2
|[[IS:UC:PositioningAndMap-Matching|Positioning and Map-Matching]]
|{{Deu|Positionierung und Kartenvergleich}}
|{{Fra|Positionnement et correspondance avec la carte}}
|POSI
|
|draft
|-
|IS
|
|
|2
|[[IS:UC:Asset status representation|Asset status representation]]
|{{Deu|Darstellung des Infrastrukturzustands}}
|{{Fra|Représentation de l'actif}}
|ASSR
|DLR for IN2Rail project
|draft
|-
|IS
|
|
|3
|[[IS:UC:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|{{Deu|Erfassung der Schieneninfrastruktur}}
|{{Fra|Enregistrement des infrastructures ferroviaires}}
|ISRC
|Bahnkonzept
|draft
|-
|IS
|TT
|
|3
|[[IS:UC:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|{{Deu|Fahrerassistenzsystem}}
|{{Fra|Système d'assistance au conducteur (DAS)}}
|DASY
|IS
|draft
|-
|IS
|
|
|3
|[[IS:UC:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]]
|{{Deu|Austausch von Planungsparametern für Stellwerke mit Her&shy;stel&shy;lern}}
|{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}}
|ISIL
|IS
|draft
|-
|IS
|
|
|3
|[[IS:UC:MaintenancePlanning|Maintenance Planning]]
|{{Deu|Wartungsplanung}}
|{{Fra|Planification de la maintenance}}
|MAPL
|
|draft
|-
|IS
|
|
|3
|[[IS:UC:PassengerInformationSystem|Passenger Information System]]
|{{Deu|Fahrgast-Informationssystem}}
|{{Fra|Système d'information voyageurs}}
|PISY
|
|draft
|-
|IS
|
|
|3
|[[IS:UC:CapacityPlanning|Capacity Planning]]
|{{Deu|Kapazitätsplanung}}
|{{Fra|Planification de la capacité}}
|CAPL
|JBV/BaneNOR
|draft
|-
|IS
|
|
|3
|[[IS:UC:NREReporting|NRE Reporting]]
|{{Deu|NRE Meldung}}
|{{Fra|Rapports NRE}}
|NRER
|ÖBB Infrastruktur
|draft
|-
|IS
|
|
|3
|[[IS:UC:Speeddirectory|Speed directory]]
|{{Deu|Verzeichnis der zulässigen Geschwindigkeiten}}
|{{Fra|Liste des vitesses autorisées}}
|SPED
|ÖBB Infrastruktur
|draft
|-
|IS
|
|
|3
|[[IS:UC:Timetabling|Timetabling]]
|{{Deu|Fahrplanerstellung}}
|{{Fra|horaires}}
|ISTT
|ProRail
|draft
|-
|IS
|
|
|3
|[[IS:UC:CADForRailwaySignaling|CAD for railway signaling]]
|{{Deu|CAD für Zugsignalisierung}}
|{{Fra|CAD pour la signalisation ferroviaire}}
|CASP
|RailComplete
|draft
|-
|IS
|
|
|3
|[[IS:UC:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]]
|{{Deu|Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen}}
|{{Fra|Capture des informations de visualisation schématique des actifs de la piste}}
|
|
|draft
|-
|IS
|
|
|3
|[[IS:UC:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|{{Deu|Eisenbahnbetriebslabor}}
|{{Fra|Laboratoire de simulation ferroviaire}}
|RLAB
|ČVUT
|draft
|-
|IS
|
|
|
|[[IS:UC:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]]
|{{Deu|Visualisierung von Schieneninfrastruktur}}
|{{Fra|Visualisation de l'infrastructure ferroviaire}}
|ISVI
|
|outdated
|-
|IS
|
|
|3
|[[UC:IS:ETCS track net|ETCS track net]]
|
|
|ETCS
|Thales
|draft
|-
|RS
|
|
|
|[[RS:UC:TractionPowerSupplySimulation|Traction power supply simulation]]
|{{Deu|Simulation der Bahnstromversorgung}}
|
|
|
|
|-
|RS
|
|
|
|[[RS:UC:OperationalSimulation|Operational simulation]]
|{{Deu|Betriebssimulation}}
|
|
|
|
|-
|TT
|
|
|
|[[TT:UC:TimetableInformation |Timetable Information]]
|{{Deu|Fahrplanauskunft}}
|{{Fra|Renseignement sur l'horaire}}
|
|<font color="green">writer: HaCon (13.03.15)</font color>; <font color="green">reviewer: IVU</font color>
|consolidated
|-
|TT
|
|
|
|[[TT:UC:PassengerInformationAtStations|Passenger information at stations]]
|{{Deu|Fahrgastinformation am Bahnhof }}
|
|
|<font color="green">writer: PSI (20.05.15)</font color>; <font color="red">reviewer: iRFP</font color>
|draft
|-
|TT
|
|
|
|[[TT:UC:ATimetableForACompetition|A timetable for a competition (call for proposals)]]
|{{Deu|Ausschreibungsfahrplan}}
|
|
|<font color="green">writer: iRFP (21.05.15)</font color>; <font color="green">reviewer: IVU (22.09.16)</font color>
|consolidated
|-
|TT
|
|
|
|[[TT:UC:ImportCompleteTimetableForVehicleWorkingSchedulingAndVehicleWorkings|Import complete timetable for vehicle working scheduling and vehicle workings]]
|{{Deu|Umlaufbildung Fahrzeuge Jahresfahrplan}}
|
|
|<font color="green">writer: IVU (20.05.15)</font color>; <font color="red">reviewer: iRFP</font color>
|draft
|-
|TT
|
|
|
|[[TT:UC:AdoptVehicleWorkingSchedulingToTimetableChanges|Adopt vehicle working scheduling to timetable changes]]
|{{Deu|Umlauf an Jahresfahrplan anpassen}}
|
|
|<font color="green">writer: IVU (21.05.15) </font color>; <font color="green">reviewer: HaCon</font color>
|consolidated
|-
|TT
|
|
|
|[[TT:UC:ExchangeOfFormationData|Exchange of formation data]]
|{{Deu|Austausch von Wagenreihungen/ Behängungsdaten}}
|
|
|<font color="green">writer: iRFP (21.05.15)</font color>; <font color="green">reviewer: IVU (22.09.16)</font color>
|consolidated
|-
|TT
|
|
|
|[[TT:UC:TAF/TAP TSI |TAF/TAP TSI requirements]]
|{{Deu|TAF/TAP TSI Anforderungen}}
|
|
|<font color="green">writer: ERA</font color>; <font color="red">reviewer: ???</font color>
|draft
|-
|TT
|
|
|
|[[TT:UC:LongTermStrategicTimetabling |Long Term Strategic Timetabling]]
|{{Deu|Langfrist-Fahrplanerstellung}}
|
|
|<font color="green">writer: SMA (22.12.16)</font color>; <font color="red">reviewer: HaCon</font color>
|draft
|-
|TT
|
|
|
|[[TT:UC:SlotOrdering |Slot ordering]]
|{{Deu|Trassenbestellung}}
|
|
|<font color="green">writer: SMA (17.09.16)</font color>; <font color="red">reviewer: iRFP</font color>
|draft
|-
|TT
|
|
|
|[[TT:UC:FGIInTrain|Passenger information inside the train]]
|{{Deu|Fahrgastinformation im Zug}}
|
|
|<font color="green">writer: Interautomation (17.01.17)</font color>; <font color="red">reviewer: PSI and iRFP</font color>
|draft
|-
|TT
|
|
|
|Automatic Route Setting ''(ARS)''<br> Automatic Train Supervision ''(ATS)''
|{{Deu|Zuglenkung}}
|
|
|<font color="red">writer: Toshiba?</font color>;<br><font color="red">reviewer: PSI</font color>
|planned
|-
|TT
|
|
|
|
|Be&shy;triebs&shy;leit&shy;sys&shy;te&shy;me/&#8203;RBL
|
|
|<font color="red">writer: PSI</font color>; <font color="red">reviewer: IVU</font color>
|planned
|-
|TT
|
|
|
|
|Dienstbildung Personal Jahresfahrplan
|
|
|<font color="red">writer: INIT</font color>; <font color="red">reviewer: IVU</font color>
|postponed
|-
|TT
|
|
|
|[[TT:UC:OperationalSimulationTimetable |Operational simulation timetable]]
|{{Deu|Betriebssimulation Fahrplan}}
|
|
|<font color="red">writer: OTRT?</font color>; <font color="red">reviewer: SMA</font color>
|postponed
|}

Latest revision as of 13:05, 25 June 2021

🗒️ This page is mirrored from page UC:Use cases/table in The railML® 3 wiki.
Directing Subschema
Involved Subschemas
Implemented in railML® version
(lowest)
Implemented in railML® version
(highest)
Priority
Description (EN) Description (DE)
Abbreviation
Reported by Status
how to interpret the status
Edited
IL IS 3.1 3.2 X Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung IMED writer: Thales Germany model February 3rd 2020 by User:RailML Coord Documentation
IS 3.1 3.2 X Network statement of an infrastructure manager Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST writer: Správa železnic (former: SŽDC) / ProRail / Bane NOR model February 3rd 2020 by User:RailML Coord Documentation
IS RS 3.1 3.2 X RINF Reporting RINF Meldung RINR writer: SNCF Réseau merged into NEST February 3rd 2020 by User:RailML Coord Documentation
IL IS 3.1 3.2 X Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplan simulieren
(ehemals: Leistungsfähigkeit Simulation)
RSIM writer: Jernbanedirektoratet / Bane NOR
(former: Jernbanedirektoratet Capacity Dpt)
model February 3rd 2020 by User:RailML Coord Documentation
IS IL 3.1 3.2 X Schematic Track Plan Schematische Gleisplandarstellung SCTP writer: Jernbanedirektoratet / Bane NOR model February 3rd 2020 by User:RailML Coord Documentation
IS TT, IL 3.2 3.2 X Integrated TMS Integriertes Verkehrsmanagement ITMS writer: Bombardier Transportation model February 3rd 2020 by User:RailML Coord Documentation
TT IL, IS, RS 3.2 3.2 X Traffic Management Plan writer: Thales Germany model February 3rd 2020 by User:RailML Coord Documentation
IS IL 3.2 3.2 X ETCS track net ETCS Streckenatlas ETCS writer: Thales Germany model February 3rd 2020 by User:RailML Coord Documentation ETCS Streckenatlas
ETCS track net: Input for Detailed Design of ETCS Trackside ETCS Streckenatlas: Übergabe der allgemeingültigen Streckendateninformationen (vom Netzbetreiber an den Lieferanten) ETCS-a writer: Thales Germany model February 3rd 2020 by User:RailML Coord Documentation |ETCS Streckenatlas
ETCS track net: Output of Detailed Design of ETCS Trackside ETCS Streckenatlas: Übergabe der Ergebnisdaten der Projektierung (vom Lieferanten an den Netzbetreiber) ETCS-b writer: Thales Germany model February 3rd 2020 by User:RailML Coord Documentation
ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement ETCS Streckenatlas: Aktualisierung der Streckendaten vor Balisengruppenplatzierung ETCS-c writer: Thales Germany model February 3rd 2020 by User:RailML Coord Documentation
TT IS, RS 3.2 3.2 X Passenger information at stations Fahrgastinformation am Bahnhof writer: PSI Transcom (20. 05. 15);
reviewer: init
model February 3rd 2020 by User:RailML Coord Documentation
TT IS, RS, IL 3.3 1 Run Time Calculation Input Data Eingangsdaten für die Fahrzeitrechnung RTCI writer: Jernbanedirektoratet / Bane NOR consolidated June 08th 2023 by User:RailML Coord Documentation
Run Time Calculation Input Data – Infrastructure properties Eingangsdaten für die Fahrzeitrechnung - Infrastruktur Eigenschaften RTCI-a writer: Jernbanedirektoratet draft
Run Time Calculation Input Data – Rolling stock properties Eingangsdaten für die Fahrzeitrechnung - Fahrzeug Eigenschaften RTCI-b writer: Jernbanedirektoratet draft
Run Time Calculation Input Data – Timetable properties Eingangsdaten für die Fahrzeitrechnung - Fahrplan Eigenschaften RTCI-c writer: Jernbanedirektoratet draft
TT IS, RS 3.3 1 Long Term Circulation Planning Langfristige Umlaufplanung LTCP reporter: IVU
writer & reviewer: TT developer group
draft November 30th 2023 by User:RailML Coord Documentation
TT IS, RS A timetable for a competition (call for proposals) Ausschreibungsfahrplan writer: iRFP (21. 05. 15);
reviewer: IVU Traffic Technologies (22. 09. 16)
consolidated February 3rd 2020 by User:RailML Coord Documentation
TT IS, RS, CO Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU Traffic Technologies (21. 05. 15);
reviewer: HaCon Ingenieurgesellschaft
consolidated February 3rd 2020 by User:RailML Coord Documentation
TT RS, IS Duty planning and staff shifts Dienstplanung und Personalschichten SHFT writer: ÖBB Personenverkehr;
reviewer: init
consolidated July 18th 2022 by User:RailML Coord Documentation
TT IS, RS Exchange of formation data Austausch von Wagenreihungen/ Behängungsdaten writer: iRFP (21. 05. 15);
reviewer: IVU Traffic Technologies (22. 09. 16)
consolidated February 3rd 2020 by User:RailML Coord Documentation
TT IS, IL, RS Long Term Strategic Timetabling Langfrist-Fahrplanerstellung LTST writer: SMA+Partner (22. 12. 16);
reviewer: HaCon Ingenieurgesellschaft (28. 6. 22)
consolidated February 3rd 2020 by User:RailML Coord Documentation
TT IS, RS Timetable Information Fahrplanauskunft TINF writer: HaCon Ingenieurgesellschaft (13. 03. 15);
reviewer: IVU Traffic Technologies
consolidated, under revision February 3rd 2020 by User:RailML Coord Documentation
IS 2 Track Geometry Gleisgeometrie TRGE writer: ÖBB Infrastruktur review February 3rd 2020 by User:RailML Coord Documentation
IS TT, IL, RS 3 Asset status representation Darstellung des Infrastrukturzustands ASSR writer: DLR for IN2Rail project draft February 3rd 2020 by User:RailML Coord Documentation
IS IL CAD for railway signaling CAD für Zugsignalisierung CASP writer: Railcomplete AS draft February 3rd 2020 by User:RailML Coord Documentation
IS IL, TT, RS 3 Capacity Planning Kapazitätsplanung CAPL writer: Bane NOR (erstwhile: JBV) draft February 3rd 2020 by User:RailML Coord Documentation
IS IL 3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen draft February 3rd 2020 by User:RailML Coord Documentation
IS TT, RS 2 Driver Advisory System (DAS) Fahrerassistenzsystem DASY writer: Siemens Mobility Germany? draft February 3rd 2020 by User:RailML Coord Documentation
IS IL, RS, TT Exchange of Logical Train Positions writer: Siemens Mobility Switzerland;
reviewer: ???
draft July 18th 2022 by User:RailML Coord Documentation
IS IL 3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Her­stel­lern ISIL writer: IS draft February 3rd 2020 by User:RailML Coord Documentation
IL IS, TT 4 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung writer: Bane NOR (former: Jernbaneverket Signalling Dpt) draft February 3rd 2020 by User:RailML Coord Documentation
IS RS 3 Maintenance Planning Wartungsplanung MAPL draft February 3rd 2020 by User:RailML Coord Documentation
IS 3 NRE Reporting NRE Meldung NRER writer: ÖBB Infrastruktur draft February 3rd 2020 by User:RailML Coord Documentation
IL IS 4 Operation and Control Betriebsführung draft February 3rd 2020 by User:RailML Coord Documentation
RS IS, TT, IL Operational simulation Betriebssimulation draft February 3rd 2020 by User:RailML Coord Documentation
TT IS, IL, RS Passenger information inside the train Fahrgastinformation im Zug writer: Interautomation (17. 01. 17);
reviewer: PSI Transcom and iRFP
draft February 3rd 2020 by User:RailML Coord Documentation
IS RS, TT 2 Passenger Information System Fahrgast-Informationssystem PISY draft February 3rd 2020 by User:RailML Coord Documentation
IS ? Posession Management Daten für Betra und Gleissperrungen POMA writer: Siemens Mobility Germany (10. 01. 22);
reviewer: HaCon Ingenieurgesellschaft
draft July 18th 2022 by User:RailML Coord Documentation
IS 3 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft February 3rd 2020 by User:RailML Coord Documentation
IS 2 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC writer: Bahnkonzept draft February 3rd 2020 by User:RailML Coord Documentation
IS IL 3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB writer: Czech Technical University Prague draft February 3rd 2020 by User:RailML Coord Documentation
TT IS, RS Slot ordering Trassenbestellung writer: SMA+Partner (17. 09. 16);
reviewer: iRFP
draft February 3rd 2020 by User:RailML Coord Documentation
IS 3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED writer: Bombardier Transportation draft February 3rd 2020 by User:RailML Coord Documentation
TT IS TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA;
reviewer: Bahnkonzept
draft February 3rd 2020 by User:RailML Coord Documentation
IS IL, TT, RS 3 Timetabling Fahrplanerstellung ISTT writer: ProRail draft February 3rd 2020 by User:RailML Coord Documentation
IL IS Hardware and cable plan Aussenanlage und Kabelplan draft February 3rd 2020 by User:RailML Coord Documentation
RS IS, TT Traction power supply simulation Simulation der Bahnstromversorgung draft February 3rd 2020 by User:RailML Coord Documentation
IS Rail Inspection Data Schienenprüfdaten RIND reporter:DZSF & ZEDAS
writer:DZSF
draft FIXME! th by [[User:]]