UC:Use cases/table: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
|- | |- | ||
! Directing Subschema !! Involved Subschemas !! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status<br><span style="font-size:50%">[[Dev:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> | ! style="width:5%"|Directing Subschema !! Involved Subschemas !! Priority !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! Abbreviation !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[Dev:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> | ||
|- | |- | ||
|IL | |IL | ||
| | | | ||
| 1 || [[IL:UC:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu| | | 1 || [[IL:UC:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahr­stras­sen für Fahr­plan si­mu­lie­ren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/​BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated | ||
|- | |- | ||
|IL | |IL | ||
Line 38: | Line 38: | ||
|1 | |1 | ||
|[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]] | |[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]] | ||
|{{Deu| | |{{Deu|Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers}} | ||
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}} | |{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}} | ||
|NEST | |NEST | ||
|SŽDC/ProRail/BaneNOR | |SŽDC/​ProRail/​BaneNOR | ||
|consolidated | |consolidated | ||
|- | |- | ||
Line 118: | Line 118: | ||
|3 | |3 | ||
|[[IS:UC:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]] | |[[IS:UC:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]] | ||
|{{Deu|Austausch von Planungsparametern für Stellwerke mit | |{{Deu|Austausch von Planungsparametern für Stellwerke mit Her­stel­lern}} | ||
|{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}} | |{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}} | ||
|ISIL | |ISIL | ||
Line 138: | Line 138: | ||
|3 | |3 | ||
|[[IS:UC:PassengerInformationSystem|Passenger Information System]] | |[[IS:UC:PassengerInformationSystem|Passenger Information System]] | ||
|{{Deu| | |{{Deu|Fahrgast-Informationssystem}} | ||
|{{Fra|Système d'information voyageurs}} | |{{Fra|Système d'information voyageurs}} | ||
|PISY | |PISY | ||
Line 198: | Line 198: | ||
|3 | |3 | ||
|[[IS:UC:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]] | |[[IS:UC:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]] | ||
|{{Deu|Erstellung schematischer | |{{Deu|Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen}} | ||
|{{Fra|Capture des informations de visualisation schématique des actifs de la piste}} | |{{Fra|Capture des informations de visualisation schématique des actifs de la piste}} | ||
| | | | ||
Line 308: | Line 308: | ||
| | | | ||
|[[TT:UC:ExchangeOfFormationData|Exchange of formation data]] | |[[TT:UC:ExchangeOfFormationData|Exchange of formation data]] | ||
|{{Deu|Austausch von Wagenreihungen/Behängungsdaten}} | |{{Deu|Austausch von Wagenreihungen/ Behängungsdaten}} | ||
| | | | ||
| | | | ||
Line 328: | Line 328: | ||
| | | | ||
|[[TT:UC:LongTermStrategicTimetabling |Long Term Strategic Timetabling]] | |[[TT:UC:LongTermStrategicTimetabling |Long Term Strategic Timetabling]] | ||
|{{Deu| | |{{Deu|Langfrist-Fahrplanerstellung}} | ||
| | | | ||
| | | | ||
Line 368: | Line 368: | ||
| | | | ||
| | | | ||
| | |Be­triebs­leit­sys­te­me/​RBL | ||
| | | | ||
| | | |
Revision as of 15:52, 18 June 2018
| ||||||||
|
CO Use Cases – IL Use Cases – IS Use Cases – RS Use Cases – TT Use Cases – Category:Use cases by company
Directing Subschema | Involved Subschemas | Priority | Description (EN) | Description (DE) | Description (FR) | Abbreviation | Reported by | Status how to interpret the status |
---|---|---|---|---|---|---|---|---|
IL | 1 | Routes for timetable simulation (former: Capacity operational simulation) |
Fahrstrassen für Fahrplan simulieren (ehemals: Leistungsfähigkeit Simulation) |
RSIM | Jernbanedirektoratet/BaneNOR (erstwhile: Jernbanedirektoratet Capacity Dpt) |
consolidated | ||
IL | 2 | Data prepration for signalling | Datenbereitstellung für Stellwerkssysteme | [[IL:UC:EulynxDataPreparationInterlocking|]] | DPRS | EULYNX (erstwhile) | requirements | |
IL | 3 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] | Jernbaneverket Signalling Dpt | draft | ||
IL | 4 | Interlocking engineering | Stellwerksprojektierung | [[IL:UC:InterlockingEngineering|]] | draft | |||
IL | 5 | Operation and Control | Betriebsführung | draft | ||||
IL | 6 | Site preparation data for Signal Controlled Warning Systems | Daten zur Standortvorbereitung für Rottenwarnsysteme | SCWS | Thales Austria | draft | ||
IL | 7 | Hardware and cable plan | Aussenanlage und Kabelplan | draft | ||||
IS | 1 | Network statement of an infrastructure manager | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | NEST | SŽDC/ProRail/BaneNOR | consolidated | ||
IS | 1 | Schematic Track Plan | Schematische Gleisplandarstellung | SCTP | JBD/BaneNOR | consolidated | ||
IS | 1 | RINF Reporting | RINF Meldung | RINR | SNCF Réseau | consolidated | ||
IS | 2 | Track Geometry | Gleisgeometrie | TRGE | ÖBB Infrastruktur | review | ||
IS | 2 | Positioning and Map-Matching | Positionierung und Kartenvergleich | POSI | draft | |||
IS | 2 | Asset status representation | Darstellung des Infrastrukturzustands | ASSR | DLR for IN2Rail project | draft | ||
IS | 3 | Railway Infrastructure Recording | Erfassung der Schieneninfrastruktur | ISRC | Bahnkonzept | draft | ||
IS | TT | 3 | Driver Advisory System (DAS) | Fahrerassistenzsystem | DASY | IS | draft | |
IS | 3 | Exchange of planning parameters for interlocking with suppliers | Austausch von Planungsparametern für Stellwerke mit Herstellern | ISIL | IS | draft | ||
IS | 3 | Maintenance Planning | Wartungsplanung | MAPL | draft | |||
IS | 3 | Passenger Information System | Fahrgast-Informationssystem | PISY | draft | |||
IS | 3 | Capacity Planning | Kapazitätsplanung | CAPL | JBV/BaneNOR | draft | ||
IS | 3 | NRE Reporting | NRE Meldung | NRER | ÖBB Infrastruktur | draft | ||
IS | 3 | Speed directory | Verzeichnis der zulässigen Geschwindigkeiten | SPED | ÖBB Infrastruktur | draft | ||
IS | 3 | Timetabling | Fahrplanerstellung | ISTT | ProRail | draft | ||
IS | 3 | CAD for railway signaling | CAD für Zugsignalisierung | CASP | RailComplete | draft | ||
IS | 3 | Capture schematic visualisation information of track assets | Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen | draft | ||||
IS | 3 | Railway Simulation Laboratory | Eisenbahnbetriebslabor | RLAB | ČVUT | draft | ||
IS | Railway Infrastructure Visualisation | Visualisierung von Schieneninfrastruktur | ISVI | outdated | ||||
IS | 3 | ETCS track net | Thales | draft | ||||
RS | Traction power supply simulation | Simulation der Bahnstromversorgung | ||||||
RS | Operational simulation | Betriebssimulation | ||||||
TT | Timetable Information | Fahrplanauskunft | writer: HaCon (13.03.15); reviewer: IVU | consolidated | ||||
TT | Passenger information at stations | Fahrgastinformation am Bahnhof | writer: PSI (20.05.15); reviewer: iRFP | draft | ||||
TT | A timetable for a competition (call for proposals) | Ausschreibungsfahrplan | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | ||||
TT | Import complete timetable for vehicle working scheduling and vehicle workings | Umlaufbildung Fahrzeuge Jahresfahrplan | writer: IVU (20.05.15); reviewer: iRFP | draft | ||||
TT | Adopt vehicle working scheduling to timetable changes | Umlauf an Jahresfahrplan anpassen | writer: IVU (21.05.15) ; reviewer: HaCon | consolidated | ||||
TT | Exchange of formation data | Austausch von Wagenreihungen/ Behängungsdaten | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | ||||
TT | TAF/TAP TSI requirements | TAF/TAP TSI Anforderungen | writer: ERA; reviewer: ??? | draft | ||||
TT | Long Term Strategic Timetabling | Langfrist-Fahrplanerstellung | writer: SMA (22.12.16); reviewer: HaCon | draft | ||||
TT | Slot ordering | Trassenbestellung | writer: SMA (17.09.16); reviewer: iRFP | draft | ||||
TT | Passenger information inside the train | Fahrgastinformation im Zug | writer: Interautomation (17.01.17); reviewer: PSI and iRFP | draft | ||||
TT | Automatic Route Setting (ARS) Automatic Train Supervision (ATS) |
Zuglenkung | writer: Toshiba?; reviewer: PSI |
planned | ||||
TT | Betriebsleitsysteme/RBL | writer: PSI; reviewer: IVU | planned | |||||
TT | Dienstbildung Personal Jahresfahrplan | writer: INIT; reviewer: IVU | postponed | |||||
TT | Operational simulation timetable | Betriebssimulation Fahrplan | writer: OTRT?; reviewer: SMA | postponed |