UC:Use cases/table: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
(adding use case ITMS) |
No edit summary |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
<noinclude>[[UC:Use cases#List|Return to article]] | |||
[[ | </noinclude> | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
|- | |- | ||
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[ | ! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> | ||
|- | |- | ||
| IL | | IL | ||
| | | | ||
| 1 || [[IL:UC:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated | |3.1 | ||
| | |||
| [[IL:UC:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated | |||
|- | |- | ||
| IL | | IL | ||
| | |||
| | | | ||
| 1 || [[IL:UC:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated | | 1 || [[IL:UC:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated | ||
|- | |- | ||
| IL | | IL | ||
| | |||
| | | | ||
| 3 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| draft | | 3 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| draft | ||
|- | |- | ||
| IL | | IL | ||
| | |||
| | | | ||
| 3 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft | | 3 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft | ||
|- | |- | ||
| IL | | IL | ||
| | |||
| | | | ||
| 4 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}|| || || draft | | 4 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}|| || || draft | ||
|- | |- | ||
| IL | | IL | ||
| | |||
| | | | ||
| 5 || [[IL:UC:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft | | 5 || [[IL:UC:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft | ||
|- | |- | ||
| IL | | IL | ||
| | |||
| | | | ||
| 6 || [[IL:UC:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft | | 6 || [[IL:UC:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft | ||
|- | |- | ||
|IS | |{{anchor|NEST}}IS | ||
| | |||
|3.1 | |||
| | | | ||
|[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]] | |[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]] | ||
|{{Deu|Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers}} | |{{Deu|Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers}} | ||
Line 46: | Line 54: | ||
|IS | |IS | ||
| | | | ||
|1 | |3.1 | ||
| | |||
|[[IS:UC:Schematic Track Plan|Schematic Track Plan]] | |[[IS:UC:Schematic Track Plan|Schematic Track Plan]] | ||
|{{Deu|Schematische Gleisplandarstellung}} | |{{Deu|Schematische Gleisplandarstellung}} | ||
Line 56: | Line 65: | ||
|IS | |IS | ||
| | | | ||
|1 | |3.1 | ||
| | |||
|[[IS:UC:RINFReporting|RINF Reporting]] | |[[IS:UC:RINFReporting|RINF Reporting]] | ||
|{{Deu|RINF Meldung}} | |{{Deu|RINF Meldung}} | ||
Line 62: | Line 72: | ||
|RINR | |RINR | ||
|SNCF Réseau | |SNCF Réseau | ||
| | |merged into [[#NEST|NEST]] | ||
|- | |- | ||
|IS | |IS | ||
|TT, IL | |||
| | | | ||
|2 | |2 | ||
Line 75: | Line 86: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|2 | |2 | ||
Line 85: | Line 97: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|2 | |2 | ||
Line 95: | Line 108: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|2 | |2 | ||
Line 105: | Line 119: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 116: | Line 131: | ||
|IS | |IS | ||
|TT | |TT | ||
| | |||
|3 | |3 | ||
|[[IS:UC:DriverAdvisorySystem|Driver Advisory System (DAS)]] | |[[IS:UC:DriverAdvisorySystem|Driver Advisory System (DAS)]] | ||
Line 125: | Line 141: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 135: | Line 152: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 145: | Line 163: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 155: | Line 174: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 165: | Line 185: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 175: | Line 196: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 185: | Line 207: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 195: | Line 218: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 205: | Line 229: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 215: | Line 240: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 225: | Line 251: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 235: | Line 262: | ||
|- | |- | ||
|IS | |IS | ||
|IL | |||
| | | | ||
|3 | |3 | ||
Line 245: | Line 273: | ||
|- | |- | ||
|RS | |RS | ||
| | |||
| | | | ||
| | | | ||
Line 255: | Line 284: | ||
|- | |- | ||
|RS | |RS | ||
| | |||
| | | | ||
| | | | ||
Line 265: | Line 295: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 275: | Line 306: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 285: | Line 317: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 295: | Line 328: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 305: | Line 339: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 315: | Line 350: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 325: | Line 361: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 335: | Line 372: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 345: | Line 383: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 355: | Line 394: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 365: | Line 405: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 375: | Line 416: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 385: | Line 427: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 395: | Line 438: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | |
Revision as of 15:22, 15 March 2019
Directing Subschema |
Involved Subschemas |
Implemented in railML® version |
Priority |
Description (EN) | Description (DE) | Description (FR) | Abbreviation |
Reported by | Status how to interpret the status |
---|---|---|---|---|---|---|---|---|---|
IL | 3.1 | Routes for timetable simulation (former: Capacity operational simulation) |
Fahrstrassen für Fahrplan simulieren (ehemals: Leistungsfähigkeit Simulation) |
RSIM | Jernbanedirektoratet/BaneNOR (erstwhile: Jernbanedirektoratet Capacity Dpt) |
consolidated | |||
IL | 1 | Interlocking module engineering data (former: Interlocking engineering) |
Stellwerksprojektierung | [[IL:UC:InterlockingEngineering|]] | IMED | Thales Germany | consolidated | ||
IL | 3 | Data prepration for signalling | Datenbereitstellung für Stellwerkssysteme | [[IL:UC:EulynxDataPreparationInterlocking|]] | DPRS | EULYNX (erstwhile) | draft | ||
IL | 3 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] | Jernbaneverket Signalling Dpt | draft | |||
IL | 4 | Operation and Control | Betriebsführung | draft | |||||
IL | 5 | Site preparation data for Signal Controlled Warning Systems | Daten zur Standortvorbereitung für Rottenwarnsysteme | SCWS | Thales Austria | draft | |||
IL | 6 | Hardware and cable plan | Aussenanlage und Kabelplan | draft | |||||
IS | 3.1 | Network statement of an infrastructure manager | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | NEST | SŽDC/ProRail/BaneNOR | consolidated | |||
IS | 3.1 | Schematic Track Plan | Schematische Gleisplandarstellung | SCTP | JBD/BaneNOR | consolidated | |||
IS | 3.1 | RINF Reporting | RINF Meldung | RINR | SNCF Réseau | merged into NEST | |||
IS | TT, IL | 2 | Integrated TMS | Integriertes Verkehrsmanagement | ITMS | Bombardier | draft | ||
IS | 2 | Track Geometry | Gleisgeometrie | TRGE | ÖBB Infrastruktur | review | |||
IS | 2 | Positioning and Map-Matching | Positionierung und Kartenvergleich | POSI | draft | ||||
IS | 2 | Asset status representation | Darstellung des Infrastrukturzustands | ASSR | DLR for IN2Rail project | draft | |||
IS | 3 | Railway Infrastructure Recording | Erfassung der Schieneninfrastruktur | ISRC | Bahnkonzept | draft | |||
IS | TT | 3 | Driver Advisory System (DAS) | Fahrerassistenzsystem | DASY | IS | draft | ||
IS | 3 | Exchange of planning parameters for interlocking with suppliers | Austausch von Planungsparametern für Stellwerke mit Herstellern | ISIL | IS | draft | |||
IS | 3 | Maintenance Planning | Wartungsplanung | MAPL | draft | ||||
IS | 3 | Passenger Information System | Fahrgast-Informationssystem | PISY | draft | ||||
IS | 3 | Capacity Planning | Kapazitätsplanung | CAPL | JBV/BaneNOR | draft | |||
IS | 3 | NRE Reporting | NRE Meldung | NRER | ÖBB Infrastruktur | draft | |||
IS | 3 | Speed directory | Verzeichnis der zulässigen Geschwindigkeiten | SPED | ÖBB Infrastruktur | draft | |||
IS | 3 | Timetabling | Fahrplanerstellung | ISTT | ProRail | draft | |||
IS | 3 | CAD for railway signaling | CAD für Zugsignalisierung | CASP | RailComplete | draft | |||
IS | 3 | Capture schematic visualisation information of track assets | Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen | draft | |||||
IS | 3 | Railway Simulation Laboratory | Eisenbahnbetriebslabor | RLAB | ČVUT | draft | |||
IS | Railway Infrastructure Visualisation | Visualisierung von Schieneninfrastruktur | ISVI | outdated | |||||
IS | IL | 3 | ETCS track net | ETCS | Thales | draft | |||
RS | Traction power supply simulation | Simulation der Bahnstromversorgung | |||||||
RS | Operational simulation | Betriebssimulation | |||||||
TT | Timetable Information | Fahrplanauskunft | writer: HaCon (13.03.15); reviewer: IVU | consolidated | |||||
TT | Passenger information at stations | Fahrgastinformation am Bahnhof | writer: PSI (20.05.15); reviewer: iRFP | draft | |||||
TT | A timetable for a competition (call for proposals) | Ausschreibungsfahrplan | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | |||||
TT | Import complete timetable for vehicle working scheduling and vehicle workings | Umlaufbildung Fahrzeuge Jahresfahrplan | writer: IVU (20.05.15); reviewer: iRFP | draft | |||||
TT | Adopt vehicle working scheduling to timetable changes | Umlauf an Jahresfahrplan anpassen | writer: IVU (21.05.15) ; reviewer: HaCon | consolidated | |||||
TT | Exchange of formation data | Austausch von Wagenreihungen/ Behängungsdaten | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | |||||
TT | TAF/TAP TSI requirements | TAF/TAP TSI Anforderungen | writer: ERA; reviewer: ??? | draft | |||||
TT | Long Term Strategic Timetabling | Langfrist-Fahrplanerstellung | writer: SMA (22.12.16); reviewer: HaCon | draft | |||||
TT | Slot ordering | Trassenbestellung | writer: SMA (17.09.16); reviewer: iRFP | draft | |||||
TT | Passenger information inside the train | Fahrgastinformation im Zug | writer: Interautomation (17.01.17); reviewer: PSI and iRFP | draft | |||||
TT | Automatic Route Setting (ARS) Automatic Train Supervision (ATS) |
Zuglenkung | writer: Toshiba?; reviewer: PSI |
planned | |||||
TT | Betriebsleitsysteme/RBL | writer: PSI; reviewer: IVU | planned | ||||||
TT | Dienstbildung Personal Jahresfahrplan | writer: INIT; reviewer: IVU | postponed | ||||||
TT | Operational simulation timetable | Betriebssimulation Fahrplan | writer: OTRT?; reviewer: SMA | postponed |