UC:Use cases/table: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
No edit summary
No edit summary
Line 4: Line 4:
{| class="wikitable sortable"
{| class="wikitable sortable"
|-
|-
! Subschema !! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status<br><span style="font-size:50%">[[Dev:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span>
! Subschema !! Co-Subschemas !! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status<br><span style="font-size:50%">[[Dev:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span>
|-
|-
|IL
|IL
|
| 1 || [[IL:UC:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated
| 1 || [[IL:UC:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated
|-
|-
|IL
|IL
|
| 2 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| requirements
| 2 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| requirements
|-
|-
|IL
|IL
|
| 3 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
| 3 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
|-
|-
|IL
|IL
|
| 4 || [[IL:UC:InterlockingEngineering|Interlocking engineering]] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || || || draft
| 4 || [[IL:UC:InterlockingEngineering|Interlocking engineering]] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || || || draft
|-
|-
|IL
|IL
|
| 5 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
| 5 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
|-
|-
|IL
|IL
|
| 6 || [[IL:UC:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
| 6 || [[IL:UC:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
|-
|-
|IL
|IL
|
| 7 || [[IL:UC:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
| 7 || [[IL:UC:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
|-
|-
|IS
|IS
|
|1
|1
|[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]]
|[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]]
Line 37: Line 45:
|-
|-
|IS
|IS
|
|1
|1
|[[IS:UC:Schematic Track Plan|Schematic Track Plan]]
|[[IS:UC:Schematic Track Plan|Schematic Track Plan]]
Line 46: Line 55:
|-
|-
|IS
|IS
|
|1
|1
|[[IS:UC:RINFReporting|RINF Reporting]]
|[[IS:UC:RINFReporting|RINF Reporting]]
Line 55: Line 65:
|-
|-
|IS
|IS
|
|2
|2
|[[IS:UC:Track Geometry|Track Geometry]]
|[[IS:UC:Track Geometry|Track Geometry]]
Line 64: Line 75:
|-
|-
|IS
|IS
|
|2
|2
|[[IS:UC:PositioningAndMap-Matching|Positioning and Map-Matching]]
|[[IS:UC:PositioningAndMap-Matching|Positioning and Map-Matching]]
Line 73: Line 85:
|-
|-
|IS
|IS
|
|2
|2
|[[IS:UC:Asset status representation|Asset status representation]]
|[[IS:UC:Asset status representation|Asset status representation]]
Line 82: Line 95:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|[[IS:UC:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
Line 91: Line 105:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|[[IS:UC:DriverAdvisorySystem|Driver Advisory System (DAS)]]
Line 100: Line 115:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]]
|[[IS:UC:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]]
Line 109: Line 125:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:MaintenancePlanning|Maintenance Planning]]
|[[IS:UC:MaintenancePlanning|Maintenance Planning]]
Line 118: Line 135:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:PassengerInformationSystem|Passenger Information System]]
|[[IS:UC:PassengerInformationSystem|Passenger Information System]]
Line 127: Line 145:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:CapacityPlanning|Capacity Planning]]
|[[IS:UC:CapacityPlanning|Capacity Planning]]
Line 136: Line 155:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:NREReporting|NRE Reporting]]
|[[IS:UC:NREReporting|NRE Reporting]]
Line 145: Line 165:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:Speeddirectory|Speed directory]]
|[[IS:UC:Speeddirectory|Speed directory]]
Line 154: Line 175:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:Timetabling|Timetabling]]
|[[IS:UC:Timetabling|Timetabling]]
Line 163: Line 185:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:CADForRailwaySignaling|CAD for railway signaling]]
|[[IS:UC:CADForRailwaySignaling|CAD for railway signaling]]
Line 172: Line 195:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]]
|[[IS:UC:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]]
Line 181: Line 205:
|-
|-
|IS
|IS
|
|3
|3
|[[IS:UC:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|[[IS:UC:Railway Simulation Laboratory|Railway Simulation Laboratory]]
Line 190: Line 215:
|-
|-
|IS
|IS
|
|
|
|[[IS:UC:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]]
|[[IS:UC:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]]
Line 199: Line 225:
|-
|-
|IS
|IS
|
|3
|3
|[[UC:IS:ETCS track net|ETCS track net]]
|[[UC:IS:ETCS track net|ETCS track net]]
Line 208: Line 235:
|-
|-
|RS
|RS
|
|
|
|[[RS:UC:TractionPowerSupplySimulation|Traction power supply simulation]]
|[[RS:UC:TractionPowerSupplySimulation|Traction power supply simulation]]
Line 217: Line 245:
|-
|-
|RS
|RS
|
|
|
|[[RS:UC:OperationalSimulation|Operational simulation]]
|[[RS:UC:OperationalSimulation|Operational simulation]]
Line 226: Line 255:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:TimetableInformation |Timetable Information]]
|[[TT:UC:TimetableInformation |Timetable Information]]
Line 235: Line 265:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:PassengerInformationAtStations|Passenger information at stations]]
|[[TT:UC:PassengerInformationAtStations|Passenger information at stations]]
Line 244: Line 275:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:ATimetableForACompetition|A timetable for a competition (call for proposals)]]
|[[TT:UC:ATimetableForACompetition|A timetable for a competition (call for proposals)]]
Line 253: Line 285:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:ImportCompleteTimetableForVehicleWorkingSchedulingAndVehicleWorkings|Import complete timetable for vehicle working scheduling and vehicle workings]]
|[[TT:UC:ImportCompleteTimetableForVehicleWorkingSchedulingAndVehicleWorkings|Import complete timetable for vehicle working scheduling and vehicle workings]]
Line 262: Line 295:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:AdoptVehicleWorkingSchedulingToTimetableChanges|Adopt vehicle working scheduling to timetable changes]]
|[[TT:UC:AdoptVehicleWorkingSchedulingToTimetableChanges|Adopt vehicle working scheduling to timetable changes]]
Line 271: Line 305:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:ExchangeOfFormationData|Exchange of formation data]]
|[[TT:UC:ExchangeOfFormationData|Exchange of formation data]]
Line 280: Line 315:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:TAF/TAP TSI |TAF/TAP TSI requirements]]
|[[TT:UC:TAF/TAP TSI |TAF/TAP TSI requirements]]
Line 289: Line 325:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:LongTermStrategicTimetabling |Long Term Strategic Timetabling]]
|[[TT:UC:LongTermStrategicTimetabling |Long Term Strategic Timetabling]]
Line 298: Line 335:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:SlotOrdering |Slot ordering]]
|[[TT:UC:SlotOrdering |Slot ordering]]
Line 307: Line 345:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:FGIInTrain|Passenger information inside the train]]
|[[TT:UC:FGIInTrain|Passenger information inside the train]]
Line 316: Line 355:
|-
|-
|TT
|TT
|
|
|
|Automatic Route Setting ''(ARS)''<br> Automatic Train Supervision ''(ATS)''
|Automatic Route Setting ''(ARS)''<br> Automatic Train Supervision ''(ATS)''
Line 325: Line 365:
|-
|-
|TT
|TT
|
|
|
|
|
Line 334: Line 375:
|-
|-
|TT
|TT
|
|
|
|
|
Line 343: Line 385:
|-
|-
|TT
|TT
|
|
|
|[[TT:UC:OperationalSimulationTimetable |Operational simulation timetable]]
|[[TT:UC:OperationalSimulationTimetable |Operational simulation timetable]]
Line 352: Line 395:
|-
|-
|TT
|TT
|
|IS
|IS
|[[IS:UC:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|[[IS:UC:DriverAdvisorySystem|Driver Advisory System (DAS)]]

Revision as of 13:54, 18 June 2018

RailML Trademark RGB V2.png
XML Railway exchange format
https://railML.org
Latest release: 2.5
(September 1st, 2021)
 
Main Menu
 
Subschemas
XML tree
UML diagrams
Use cases
Versions & Changes

CO Use CasesIL Use CasesIS Use CasesRS Use CasesTT Use CasesCategory:Use cases by company

Subschema Co-Subschemas Priority Description (EN) Description (DE) Description (FR) Abbreviation Reported by Status
how to interpret the status
IL 1 Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplan simulieren
(ehemals: Leistungsfähigkeit Simulation)
RSIM Jernbanedirektoratet/BaneNOR
(erstwhile: Jernbanedirektoratet Capacity Dpt)
consolidated
IL 2 Data prepration for signalling Datenbereitstellung für Stellwerkssysteme [[IL:UC:EulynxDataPreparationInterlocking|]] DPRS EULYNX (erstwhile) requirements
IL 3 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] Jernbaneverket Signalling Dpt draft
IL 4 Interlocking engineering Stellwerksprojektierung [[IL:UC:InterlockingEngineering|]] draft
IL 5 Operation and Control Betriebsführung draft
IL 6 Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS Thales Austria draft
IL 7 Hardware and cable plan Aussenanlage und Kabelplan draft
IS 1 Network statement of an infrastructure manager Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers NEST SŽDC/ProRail/BaneNOR consolidated
IS 1 Schematic Track Plan Schematische Gleisplandarstellung SCTP JBD/BaneNOR consolidated
IS 1 RINF Reporting RINF Meldung RINR SNCF Réseau consolidated
IS 2 Track Geometry Gleisgeometrie TRGE ÖBB Infrastruktur review
IS 2 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft
IS 2 Asset status representation Darstellung des Infrastrukturzustands ASSR DLR for IN2Rail project draft
IS 3 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC Bahnkonzept draft
IS 3 Driver Advisory System (DAS) Fahrerassistenzsystem DASY IS draft
IS 3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Herstellern ISIL IS draft
IS 3 Maintenance Planning Wartungsplanung MAPL draft
IS 3 Passenger Information System Fahrgastinformationssystem PISY draft
IS 3 Capacity Planning Kapazitätsplanung CAPL JBV/BaneNOR draft
IS 3 NRE Reporting NRE Meldung NRER ÖBB Infrastruktur draft
IS 3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED ÖBB Infrastruktur draft
IS 3 Timetabling Fahrplanerstellung ISTT ProRail draft
IS 3 CAD for railway signaling CAD für Zugsignalisierung CASP RailComplete draft
IS 3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungsinformationen von Schienenanlagen draft
IS 3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB ČVUT draft
IS Railway Infrastructure Visualisation Visualisierung von Schieneninfrastruktur ISVI outdated
IS 3 ETCS track net Thales draft
RS Traction power supply simulation Simulation der Bahnstromversorgung
RS Operational simulation Betriebssimulation
TT Timetable Information Fahrplanauskunft writer: HaCon (13.03.15); reviewer: IVU consolidated
TT Passenger information at stations Fahrgastinformation am Bahnhof writer: PSI (20.05.15); reviewer: iRFP draft
TT A timetable for a competition (call for proposals) Ausschreibungsfahrplan writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated
TT Import complete timetable for vehicle working scheduling and vehicle workings Umlaufbildung Fahrzeuge Jahresfahrplan writer: IVU (20.05.15); reviewer: iRFP draft
TT Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU (21.05.15) ; reviewer: HaCon consolidated
TT Exchange of formation data Austausch von Wagenreihungen/Behängungsdaten writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated
TT TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA; reviewer: ??? draft
TT Long Term Strategic Timetabling Langfristfahrplanerstellung writer: SMA (22.12.16); reviewer: HaCon draft
TT Slot ordering Trassenbestellung writer: SMA (17.09.16); reviewer: iRFP draft
TT Passenger information inside the train Fahrgastinformation im Zug writer: Interautomation (17.01.17); reviewer: PSI and iRFP draft
TT Automatic Route Setting (ARS)
Automatic Train Supervision (ATS)
Zuglenkung writer: Toshiba?;
reviewer: PSI
planned
TT Betriebsleitsysteme/RBL writer: PSI; reviewer: IVU planned
TT Dienstbildung Personal Jahresfahrplan writer: INIT; reviewer: IVU postponed
TT Operational simulation timetable Betriebssimulation Fahrplan writer: OTRT?; reviewer: SMA postponed
TT IS Driver Advisory System (DAS) Fahrerassistenzsystem DASY draft